Product Details:
Payment & Shipping Terms:
|
Name: | Prefabricated Steel Truss Bridge | Brand Name: | Harzone |
---|---|---|---|
Application: | Emergency Bridges | Tracked Load: | Tracked Load 50t |
Certificate: | ISO9001 | Color: | Any Color You Want |
Structure Type: | Steel Truss Bridge | Installation: | Engineers Guidance |
Highlight: | 54m Prefabricated Steel Truss Bridge,50t Prefabricated Steel Truss Bridge,54m truss steel bridge |
Prefabricated Steel Truss Bridge Description:
Length 54m Tportable Foot Bridge Bridge Bailey Bridge adopts modular design, featuring a large span,short construction period,fast erection, multiple reuses of bridge components. It has excellent interchangeability and connection ferformance. Length 54m Tportable Foot Bridge Bridge Bailey Bridge surface protection can be paint or hot-dip galvanized.
Prefabricated Steel Truss Bridge Specifications:
Type | CB100 |
Designed Span | 6-60m |
Designed Load | HS25-44,Axle Load 20t,tracked load 50t |
Panel Dimension | 1.448*3.048m |
Carriageway Width | 4.2m/7.35m |
Deck type | steel deck/ wood deck |
On May 12,2008, an 8.0-magnitude earthquake struck Wenchuan County, Sichuan Province. Roads in the quake-hit area were severely damaged and more than 400,000 people were trapped. The rapid construction of Zhouqiao and highway steel bridges became the first lifeline to the disaster area.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884